Trilith Studios stands as our longest-running and most expansive active project to date. Since 2013, Paulson-Cheek Mechanical has been integral in designing and building the HVAC systems for this renowned production facility. Over the years, we’ve outfitted 31 state-of-the-art sound stages with precision-engineered climate control, tailored to the unique demands…
Paulson-Cheek Mechanical was awarded numerous Shell and Tenant Improvement projects at The Battery development as the Braves relocated from their long time home at Turner Field to The Battery at Truist. PCM was able to successfully turnover numerous projects in both a mechanical contractor role and a mechanical design/builder role. …